Aqua Flow Installation Form

This form must be completed and submitted to Everhard Industries within 30 days of commissioning to commence the 2-year warranty period. Not submitting this document will result in a standard 1-year manufacturer’s warranty.  

Pump Station Commissioning / Warranty Form

"(Required)" indicates required fields

Customer

Installer Name(Required)
MM slash DD slash YYYY
MM slash DD slash YYYY
If different to the installation date

Pump Station

Discharge Pipe Work

The minimum velocity we recommend is 0.7m/s, to stop solids settling, depending on the type of effluent this may need to be higher.
Max. file size: 20 MB.
Please upload a letter/document from the pump station specifying engineer approving the selected Everhard Industries Pump Station for the application. This is to ensure the correct pumps have been chosen for the application as incorrect pump selection is the leading cause of early pump failure.
Drop files here or
Max. file size: 20 MB.
    Inside of pump station showing PVC pipework is not cracked and fittings are as intended
    Drop files here or
    Max. file size: 20 MB.
      Inside showing float switch/s are not tangled and are free to move vertically
      Drop files here or
      Max. file size: 20 MB.
        Showing access cover and gasket have been screwed into place using 12 screws
        Drop files here or
        Max. file size: 20 MB.
          Photo of high-level alarm or controller connected to the system